Production
samples will be randomly drawn when they are packed
for shipment. A comprehensive inspection that
conforms to the pre-designed specifications and
sampling plan will be conducted.
STR issues an inspection report the
next working days after the inspection is completed.
The report will indicate a rating of either "Accepted"
or Rejected", a recap of all defects as well
as any applicable comments or recommendations.
An inspection certificate is a negotiable document
allowing vendors to cash the L.C. This certificate
is only issued on "Accepted" inspections |